Almost all time not spent at work or sleeping this past week was spent at the theater painting my set. This will likely continue until the show opens on the 20th. It's a really big set. There is a lot to paint, and it isn't even all built yet.
Work was busy, too. Working on presentation boards for a competition next week. The boss offered to take us out to a nice dinner if we get the job. I told him if we get the job I want to be on the team - it's a huge theater in North Carolina, in the city where R proposed. :-)
In the little time I've had to knit, I bound off the swallowtail shawl. Then I noticed a hole that seemed to big, and soon after I noticed a dropped stitch nearby! I caught the stitch but haven't done anything else with it since. I need time to sit down and see if I can fix it without undoing the bind off. But I'm not going to try to do that while I'm so busy. In the meantime, I've been working on Dulaan mittens on the bus. I pair completed and a second pair started.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment